Sutter Medical Center – Castro Valley

SF-Bay Area

As part of a project team led by DPR, Clark Pacific collaboratively engineered, manufactured, and installed C-CAPP and GFRC panels for this new 130-bed acute care facility.  The project is one of the first Integrated Project Delivery (IPD) hospital projects in California.  The project team utilized BIM technologies and lean design, manufacturing, and construction principles to create streamlined schedules and seamless delivery.  (Renderings courtesy of Devenney Group, Ltd, Architects.)

GALLERY

Facts and Figures

State: CA

City: Castro Valley

Building Type: Hospital

Square Feet: 56,919

Year Completed: 2011

Job Number: 497

Team

Architect

General Contractor

Structural Engineer

TTG

Owner

Sutter Health

Products

Facades

Through collaborative design, advanced manufacturing and efficient construction, we transform the way buildings are delivered. Our people are paving the way for prefabrication as a smarter, safer and more efficient way to bring great designs to life, while reducing risk and providing owners with cost, schedule and scope certainty.

Related Projects

Prefabricated, Single Source Solutions for the Entire Building Envelope

Design-Manufacture-Build for the complete parking structure.

Our integrated office platform delivers a highly sustainable, energy-efficient office building solution.