Target Sunnyvale Parking Garage

21 days total precast erection.

When developers decided a new Target store was to be the new anchor store as part of the revitalization and development of the existing Sunnyvale Town Center, in Sunnyvale, California, precast concrete was determined as the material of choice for the parking garage and below-grade receiving area. The 106,000 sq ft. parking garage was a mixed-use podium concept garage, featuring long-spanning precast double tees that allowed for an expansive interior feel with fewer columns, as well as integrated precast podiums allowing for the Target retail both above and at ground level. Total precast erection time spanned 21 days, giving surrounding neighbors and businesses a store that could anchor the community within a short construction schedule.

Facts and Figures

State: CA

City: Sunnyvale

Building Type: Parking

Square Feet: 138880

Year Completed: 2009

Job Number: 6031

Team

Owner

General Contractor

Architect

Structural Engineer

Products

Parking

Through collaborative design, advanced manufacturing and efficient construction, we transform the way buildings are delivered. Our people are paving the way for prefabrication as a smarter, safer and more efficient way to bring great designs to life, while reducing risk and providing owners with cost, schedule and scope certainty.

Related Projects

Prefabricated, Single Source Solutions for the Entire Building Envelope

Design-Manufacture-Build for the complete parking structure.